Asphalt Overlay 2025
Project Description
Each year the City of Kettering evaluates the conditions of all the city streets to create the annual street maintenance program. After the streets are evaluated, they are then ranked according to the pavement condition and a list is created for the streets that may be paved this year.
Project Update
The Engineering Department will open bids in February 2025 to select the contractor for the project. Construction is anticipated to begin in the summer of 2025. Please check back for updates in the spring of 2025.
Project Location
This year’s Asphalt Overlay Program includes milling the existing and pacing new asphalt on several residential streets along with replacing curb ramps to meet ADA compliance.
Streets Include:
- Kenmar Street
- Santa Rosa Drive (Glenheath to Montezuma), Santa Rosa Drive (west of Montezuma)
- Burning Tree Drive (west of Wallington), Burning Tree Drive (east of Wallington)
- Cherry Oak Drive
- Green Springs Drive
- Hazelhurst Court
- Sillman Place
- Wallington Drive
- Woodner Drive
- Clarendon Drive (south of Burning Tree), Clarendon Drive (north of Burning Tree)
- Hemphill Road (west of Glenheath)
- Appleton Place (west of Glenheath)
- Montezuma Place
- Ansel Drive
- East Stroop Road (in front of Town and Country)
- Patterson Road (Dayton Corp. to Woodman Drive)
BID Information
Bid Date: January 30, 2025
Bid Results Bid Tab
Contractor: To be determined
Contact Information
Project Engineer: Chad Ingle, P.E., P.S.
Email: chad.ingle@ketteringoh.org
Phone:937-296-2436