Wilmington Pike Resurfacing

Status Update

October 23, 2023: The project is complete

Project Description

Replacement of deteriorated curbs, sidewalks and drive approaches, then roadway resurfacing.

Project Limits

Wilmington Pike from Beaverton Drive to Stroop Road

Bid Date: February 9, 2023        Bid Results                     Bid Tab

Contractor

Barrett Paving

Project Engineer

Chad Ingle, PE, PS
Email:  Chad.ingle@ketteringoh.org

Close window